X20CrMoV121 Seamless Alloy Steel Tube THK 6.3MM Length 6M Coating
![X20CrMoV121 Seamless Alloy Steel Tube THK 6.3MM Length 6M Coating](https://img.jeawincdn.com/resource/upfiles/65/images/products/pipe/alloy-steel-pipe/x20crmov121-seamless-alloy-steel-tube-thk-6-3mm-length-6m-coating.png?q=90&fm=webp&s=8cd85104e916a1eca844dccdc6b5f2e0)
Key Specifications / Features
Model No.: DB-Alloy Steel Tube-694 Hits: 73
China Seamless Alloy Steel Tube Factory Derbo Supplies X20CrMoV121 Seamless Alloy Steel Tube, Cold Drawn, Thickness 6.3MM, Length 6M, Coating, Boiler.
Request a quote
Share
Tags:
Detail Infomation
Type: Seamless Alloy Steel Tube.
Material And Grade: X20CrMoV121.
Size: THK 6.3MM, Length 6M.
Manufacture Method: Cold Drawn.
Surface Treatment: Oiled, Coating, Painting.
Independence Inspection: Chemical Test, Mechanical Test.
Application: Boiler and Heat Exchanger, etc.
Third Party Inspection: SGS, BV, INTERNET, etc.
Packing: In Bundles/Pallet or as Your Requirement.
Payment Terms: TT/LC, West Union, Paypal, O/A.
Delivery Time: 7-25 Days after Receiving the Deposit.
Material And Grade: X20CrMoV121.
Size: THK 6.3MM, Length 6M.
Manufacture Method: Cold Drawn.
Surface Treatment: Oiled, Coating, Painting.
Independence Inspection: Chemical Test, Mechanical Test.
Application: Boiler and Heat Exchanger, etc.
Third Party Inspection: SGS, BV, INTERNET, etc.
Packing: In Bundles/Pallet or as Your Requirement.
Payment Terms: TT/LC, West Union, Paypal, O/A.
Delivery Time: 7-25 Days after Receiving the Deposit.